FirstMerit Tower

 

Historic Ohio Skyscraper Picks Aquatherm to Replace Wasteful Steel Piping System

After a skyscraper has been around for a few years, for some of us, it begins to fade into the skyline. And after a few decades, when buildings begin to wear around the edges, we barely notice a few of the one-majestic structures. It can be easy to forget that some of these institutions aren’t simply boring office buildings – they are perfect examples of influential architecture.

The centerpiece of downtown Akron, OH, the 27-story First Merit Tower was completed when art decor was at the height of its popularity in the U.S. in 1931. After undergoing a facelift and restoration, the Tower is listed on the National Register of Historic Places, which helps ensure the building won’t be forgotten for many lifetimes.

Alpha Packaging

Saving the Day for a Local Manufacturing Company

Alpha Packaging is in the business to manufacture plastic packaging for personal care, nutritional supplements, food and beverage, pharmaceuticals, and consumer chemicals. The location in Cleveland primarily produces bottling for personal care products and is running production 24 hours per day, 7 days a week.

Harner Plumbing anticipated a three day shut down for the removal and replacement of 580’ of 4” and 6” Stainless Steel Chiller Piping and Insulation at Alpha Packaging and tying into 20 different production lines. Harner Plumbing was able to complete this project in 2 days thus allowing Alpha to get back up and running a day earlier than planned. Alpha Packaging was grateful for the timeframe in which the project was completed and expressed their gratitude in the letter that was sent over.

www.alphap.com

A sincere thanks to you and your team of expert pipefitters for all the hard work on our piping project completed in May 2019. Harner Plumbing exceeded our expectations for the installation of 480 feet of 4″ and 6″ stainless pipe with Victaulic fittings. The original project was scheduled for 3 days plus additional time for insulating the piping. 

Due to the initiative of your 12 man team, the total project was completed in two 10 hour days. Alpha’s manufacturing team was able to restart our manufacturing machinery at our normal timetable and prevent a loss of production because of your expedited work, Alpha technical staff also did not have to work additional hours to keep the manufacturing space open for the project.

Jerry Litchney, Director of Project Engineering

Contact Our Team for Reliable Plumbing Solutions

From traditional plumbing to trenchless sewer and drain solutions, Harner Plumbing is here to serve you.
Contact us to schedule service.